With four components of protection the process adds strength and helps our products withstand impacts freeze thaw cycles high humidity fungal decay and termites.
Lp shake siding installation instructions.
Starting from left to right level and install shake so bottom edge is no more than 1 2 inch 13 mm below.
Application instructions cont install kick out flashing to direct the water into the gutter install step flashing with minimum 4 in.
Tools and materials as in standard construction practices install smartside siding by nailing to studs spaced 16 inches on center using hot dipped galvanized nails.
All siding joints must fall on studs.
How to install lp smartside trim siding.
At shiplap edges double nailing is required.
Lp smartside trim siding products are treated with our proprietary smartguard process.
Download our helpful installation instructions and watch our informative how to videos.
How to install.
How to install lp smartside trim siding.
Lp smartside 3 8 x 12 x 48 reversible cedar texture strand shake offers the beautiful look of real cedar shake siding with the greater durability of treated engineered wood and less maintenance required.
Contractors watch this video to learn about the advantages of using lp smartside trim siding products and how to install them.
Diagrams 4a 4b staggered edge.
The installation instructions recommend nails with a shank diameter of at least 113 inches and a head diameter of at least 27 inches.
Lp smartside cedar shake is a reversible siding product that can be applied with either a staggered edge appearance or rotated 180 degrees to achieve straight edge appearance.
Find product specifications warranties installation instructions and msds for all lp building solutions in our product literature resource center.
Diamond kote building products is a preferred prefinisher for lp smartside an engineered siding wood product.