How to install lp smartside trim siding.
Lp smartside vertical siding installation instructions.
Prefinished lap joint siding.
Nailing instructions lp smartside 38 series lap siding may be attached directly to framing members spaced a maximum of 16 inches 406 mm o c.
Board and batten with vertical panel siding.
Download our helpful installation instructions and watch our informative how to videos.
Trim install kick out flashing to direct the water into the gutter install step flashing with minimum 4 in.
Trim with hidden fastener system.
We ll also review the proper tools needed and.
Tn 028 vertical siding.
View all product literature.
Lp smartside 38 series lap siding may be attached directly to framing members that are spaced up to a maximum of 16 in.
Separate smartside siding from veneers with minimum 3 8 inch 10 mm space for horizontal or vertical joints use sealant.
Lp smartside 76 series lap siding may be attached directly to framing members spaced a maximum of 24 inches 610 mm o c.
Nailing instructions lp smartside 76 series lap siding may be attached directly to framing members spaced up to a maximum of 24 in.
Step 1 hold the metal.
Roof edge up to the eave edge of the roof line.
Lp smartside lap siding installation using h molding.
Check your local building code before starting to install the sid.
Lp smartside siding is not designed and or manufactured to be used as trim or fascia.
Check your local building codes before starting to install siding.
Lp smartside precision series lap siding installation instructions.
Keep the top edge of the metal on the plane of the sheathing slide the metal roof edge up or down the roof until a 5 8 measurement is achieved perpendicularly out from the fascia to the inside of the bend in the metal roof edge.
When using smartside siding with other siding products like stucco brick or cultured stone veneers it is important to use a capillary break so moisture absorbed into those veneers cannot be transferred into siding.